Information Collection Request (ICR) Tracker

ICR Definition

An Information Collection Request (ICR) is a federal agency’s request for approval from the Office of Management and Budget (OMB) to collect information from the public. Under the Paperwork Reduction Act (PRA), agencies must justify why the information is needed and how it will be used.

Federal agencies are required to submit an ICR whenever they create, renew, modify, or discontinue an information collection. Each ICR includes a description of the collection, supporting materials and documentation (such as forms, surveys, or scripts), and proof that the agency has met the requirements of the PRA.

The ICR is submitted to the The Office of Information and Regulatory Affairs (OIRA) within OMB for review and approval. OIRA grants approval for a maximum of three years, after which the collection must be renewed through a new ICR submission.

ICRs are publicly available on RegInfo.gov, and additional guidance can be found in the FAQs.

ICR Explorer

Showing 20 of 12016 results

Reference Number Title Agency Status Request Type
202203-1210-004 Prohibited Transaction Class Exemptions for Multiple Employer Plans and Multiple Employer Apprenticeship Plans—PTE 1976-1, PTE 1977-10, PTE 1978-6 DOL/EBSA Active
Extension without change of a currently approved collection
Prohibited Transaction Class Exemptions for Multiple Employer Plans and Multiple Employer Apprenticeship Plans—PTE 1976-1, PTE 1977-10, PTE 1978-6

Key Information

Received 2022-04-28
Concluded 2022-06-06
Expires 2025-06-30
Action Approved without change
OMB Control # 1210-0058
Previous ICR 201904-1210-001

Federal Register Notices

60-Day FRN View Notice
30-Day FRN View Notice

Authorizing Statutes

29 USC 1108(a) (View Law)

29 USC 1106 (View Law)

29 USC 1107 (View Law)

Abstract

PTE 76-1 permits multi employer employee benefit plans under specific conditions to negotiate with contributing employer to accept delinquent contributions and settle delinquencies; to make construction loans to contributing employers; and to lease property and purchase services and goods from parties in interest, including contributing employers and employee associations. PTE 77-10 expands the scope of relief provided under PTE 76-1 part C, for leasing property and purchasing goods and services. PTE 78-6 provides an exemption to multi employer apprenticeship plans for purchasing personal property or leasing real property from a contributing employer. All three exemptions impose recordkeeping requirements on plans as a condition to availability of the relief.

202112-1625-010 Plan Approval and Records for U.S. and Foreign Tank Vessels Carrying Oil in Bulk DHS/USCG Historical Active
Extension without change of a currently approved collection
Plan Approval and Records for U.S. and Foreign Tank Vessels Carrying Oil in Bulk

Key Information

Received 2022-01-19
Concluded 2022-06-06
Expires 2025-06-30
Action Approved with change
OMB Control # 1625-0036
Previous ICR 201804-1625-008

Federal Register Notices

60-Day FRN View Notice
30-Day FRN View Notice

Authorizing Statutes

46 USC 3703a (View Law)

46 USC 3705 (View Law)

46 USC 3706 (View Law)

46 USC 3703 (View Law)

46 USC 3707 (View Law)

46 USC 3710 (View Law)

46 USC 3711 (View Law)

33 USC 1903 (View Law)

Abstract

This information collection aids the Coast Guard in determining if a vessel complies with certain safety and environmental protection standards. Plans/records for construction or modification of U.S. or foreign vessels submitted and/or maintained on board are needed for compliance with these standards. The statutory authority for the requirements are 33 U.S.C. 1903, 46 U.S.C. 3703, 3703a, 3705, 3706, 3707, 3710 and 3711.

202204-0938-012 Payment Collections Operations Contingency Plan (CMS-10515) HHS/CMS Historical Active
Reinstatement with change of a previously approved collection
Payment Collections Operations Contingency Plan (CMS-10515)

Key Information

Received 2022-04-28
Concluded 2022-06-06
Expires 2025-06-30
Action Approved without change
OMB Control # 0938-1217
Previous ICR 201711-0938-011

Federal Register Notices

60-Day FRN View Notice
30-Day FRN View Notice

Authorizing Statutes

Pub.L. 111 - 148 1402 (View Law)

Pub.L. 111 - 148 1401 (View Law)

Abstract

Under sections 1401, 1411, and 1412 of the Affordable Care Act and 45 CFR part 155 subpart D, an Exchange makes an advance determination of tax credit eligibility for individuals who enroll in QHP coverage through the Exchange and seek financial assistance. Using information available at the time of enrollment, the Exchange determines whether the individual meets the income and other requirements for advance payments and the amount of the advance payments that can be used to pay premiums. Advance payments are made periodically under section 1412 of the Affordable Care Act to the issuer of the QHP in which the individual enrolls. Section 1402 of the Affordable Care Act provides for the reduction of cost sharing for certain individuals enrolled in a QHP through an Exchange, and section 1412 of the Affordable Care Act provides for the advance payment of these reductions to issuers. The statute directs issuers to reduce cost sharing for essential health benefits for individuals with household incomes between 100 and 400 percent of the Federal poverty level (FPL) who are enrolled in a silver level QHP through an individual market Exchange and are eligible for advance payments of the premium tax credit. Health insurance issuers will manually enter enrollment and payment data into a Microsoft Excel-based spreadsheet, and submit the information to HHS. The data collection will be used by HHS to make payments or collect charges from issuers under the following programs: advance payments of the premium tax credit, advanced cost-sharing reductions, and Marketplace user fees. HHS will use the information collected to make payments and collect charges in January 2014 and for a number of months thereafter, as may be required based on HHS's operational progress.

202204-2060-005 NSPS for Surface Coating of Plastic Parts for Business Machines (40 CFR part 60, subpart TTT) (Renewal) EPA/OAR Active
Revision of a currently approved collection
NSPS for Surface Coating of Plastic Parts for Business Machines (40 CFR part 60, subpart TTT) (Renewal)

Key Information

Received 2022-04-12
Concluded 2022-06-03
Expires 2025-06-30
Action Approved without change
OMB Control # 2060-0162
Previous ICR 201904-2060-003

Federal Register Notices

60-Day FRN View Notice
30-Day FRN View Notice

Authorizing Statutes

42 USC 7401 et seq. (View Law)

Abstract

The New Source Performance Standards (NSPS) for Surface Coating of Plastic Parts for Business Machines (40 CFR Part 60 Subpart TTT) were proposed on January 8, 1986, promulgated on January 29, 1988, and amended on October 17, 2000. These regulations apply to new facilities that perform industrial surface coating operations on plastic parts for use in the manufacture of business machines: each spray booth that applies prime coats, color coats, texture coats or touch-up coats. New facilities include those that commenced construction, modification, or reconstruction after the date of proposal. This information is being collected to assure compliance with 40 CFR Part 60, Subpart TTT. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NSPS.

202203-2060-013 NSPS for Synthetic Fiber Production Facilities (40 CFR Part 60, Subpart HHH) (Renewal) EPA/OAR Active
Extension without change of a currently approved collection
NSPS for Synthetic Fiber Production Facilities (40 CFR Part 60, Subpart HHH) (Renewal)

Key Information

Received 2022-03-31
Concluded 2022-06-03
Expires 2025-06-30
Action Approved without change
OMB Control # 2060-0059
Previous ICR 201904-2060-002

Federal Register Notices

60-Day FRN View Notice
30-Day FRN View Notice

Authorizing Statutes

42 USC 7401 et seq (View Law)

Abstract

The New Source Performance Standards (NSPS) for Synthetic Fiber Production Facilities (40 CFR Part 60, Subpart HHH) were proposed on November 23, 1982, promulgated on April 5, 1984, and amended on October 17, 2000. These regulations apply to both existing and new synthetic fiber production plants with a solvent-spun, synthetic fiber process that produce more than 500 megagrams (Mgs) of fiber per year that commenced construction or reconstruction after the date of proposal. The provisions of this subpart do not apply to any facility that uses the reaction spinning process to produce spandex fiber, or the viscose process to produce rayon fiber, or to facilities that commence modification, but not reconstruction, after the date of proposal. This information is being collected to assure compliance with 40 CFR Part 60, Subpart HHH. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NSPS.

202111-2060-005 NESHAP for Refractory Products Manufacturing (40 CFR Part 63, Subpart SSSSS) (Final Rule) EPA/OAR Active
Revision of a currently approved collection
NESHAP for Refractory Products Manufacturing (40 CFR Part 63, Subpart SSSSS) (Final Rule)

Key Information

Received 2022-02-04
Concluded 2022-06-03
Expires 2025-06-30
Action Approved without change
OMB Control # 2060-0515
Previous ICR 201903-2060-007

Federal Register Notices

60-Day FRN View Notice

Authorizing Statutes

42 USC 7401 et seq (View Law)

Abstract

The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Refractory Products Manufacturing (40 CFR Part 63, Subpart SSSSS) were proposed on June 20, 2002, and promulgated on April 16, 2003. These regulations apply to each refractory products manufacturing facility which produces refractory bricks, refractory shapes, monolithics, kiln furniture, crucibles, and other materials used as linings for boilers, kilns, and other processing units and equipment where extreme temperature, corrosions, and abrasion would destroy other materials. These regulations apply to existing facilities and new facilities that manufacture refractory products and use organic hazardous air pollutant (HAP), chromium refractory, and clay refractory products. New facilities include those that commenced construction, modification or reconstruction after the date of proposal. Amendments to the NESHAP are being promulgated as a result of the residual risk and technology review (RTR) required under the Clean Air Act (CAA) (as discussed further below). This information is being collected to assure compliance with 40 CFR part 63, subpart SSSSS. The promulgated amendments to the rule eliminate the startup, shutdown, and malfunction (SSM) exemption; remove the SSM plan and SSM recordkeeping requirements; require electronic submittal of performance test results; add standards for mercury and non-mercury metal HAP from new and existing clay refractory kilns, add requirements around the work practice standard that applies when a continuous kiln total hydrocarbon (THC) control device is bypassed for scheduled maintenance; and make miscellaneous technical and editorial changes. The remaining portions of the NESHAP remain unchanged. This ICR estimates the additional burden due to the rule amendments for HAP-major source refractory products manufacturing facilities in addition to the burden estimates for provisions that are unchanged by the amendments.

202107-1902-006 FERC-725G4, Mandatory Reliability Standards: Reliability Standard PRC-010-2 (Undervoltage Load Shedding) FERC Active
Extension without change of a currently approved collection
FERC-725G4, Mandatory Reliability Standards: Reliability Standard PRC-010-2 (Undervoltage Load Shedding)

Key Information

Received 2021-11-17
Concluded 2022-06-03
Expires 2025-06-30
Action Approved without change
OMB Control # 1902-0282
Previous ICR 201901-1902-002

Federal Register Notices

60-Day FRN View Notice
30-Day FRN View Notice

Authorizing Statutes

16 USC 824o (View Law)

Abstract

FERC-725G4 consists of the information collection requirements of Reliability Standard PRC-010-2 (Undervoltage Load Shedding). The purpose of Reliability Standard PRC-010-2 and the associated information collection is to establish an integrated and coordinated approach to the design, evaluation, and reliable operation of Undervoltage Load Shedding (UVLS) Programs. NERC requests and collects data relevant to UVLS Programs from Planning Coordinators and Transmission Planners in accordance with this Reliability Standard.

202107-1902-005 FERC-725G1, Mandatory Reliability Standards for the Bulk-Power System: Reliability Standard PRC-004-6 (Protection System Misoperation Identification and Correction) FERC Active
Extension without change of a currently approved collection
FERC-725G1, Mandatory Reliability Standards for the Bulk-Power System: Reliability Standard PRC-004-6 (Protection System Misoperation Identification and Correction)

Key Information

Received 2021-11-17
Concluded 2022-06-03
Expires 2025-06-30
Action Approved without change
OMB Control # 1902-0284
Previous ICR 202009-1902-006

Federal Register Notices

60-Day FRN View Notice
30-Day FRN View Notice

Authorizing Statutes

Pub.L. 109 - 58 1211 (View Law)

Abstract

FERC-725G1 consists of the information collection requirements associated with Reliability Standard PRC-004-6 (“Protection System Misoperation Identification and Correction”). The purpose of Reliability Standard PRC-004-6 and the associated information collection is to ensure the identification and correction of the causes of misoperations of protection systems.

202010-2900-006 Health Eligibility Center (HEC) Income Verification (IV) Forms VA Active
Reinstatement with change of a previously approved collection
Health Eligibility Center (HEC) Income Verification (IV) Forms

Key Information

Received 2022-03-15
Concluded 2022-06-03
Expires 2025-06-30
Action Approved without change
OMB Control # 2900-0867
Previous ICR 201606-2900-001

Federal Register Notices

60-Day FRN View Notice
30-Day FRN View Notice

Authorizing Statutes

38 USC 1722 (View Law)

Abstract

VHA Directive 1909 provides policy for the Income Verification (IV) Program. AUTHORITY: 38 United States Code (U.S.C.) 1722; 38 U.S.C. 5317. Title 38 U.S.C. 1722 established eligibility assessment procedures, based on income levels, for determining whether nonservice-connected (NSC) Veterans and non-compensable zero percent service-connected (SC) Veterans, who have no other special eligibility are eligible to receive Department of Veterans Affairs (VA) health care at no cost. Title 26 U.S.C. 6103 (l)(7) of the Internal Revenue Code, and 38 U.S.C. 5317 establish authority for VA to verify Veterans’ gross household income information against records maintained by the Internal Revenue Service (IRS) and Social Security Administration (SSA) when that information indicates the Veteran is eligible for cost-free VA health care. In accordance with VHA Directive 1909, it is VA policy that the Health Eligibility Center (HEC) is responsible for the Income Verification Program, i.e., verifying NSC and non-compensable zero percent SC Veterans’ gross household income through computer matching activity with IRS and SSA. The social security numbers (SSNs) of all Veterans and their spouses identified in the financial assessment will be verified under the Social Security Number Verification Information Exchange Agreement (IEA), between the SSA and VHA HEC, prior to income matching activity with IRS. If IRS and SSA income matching identifies discrepancies in the Veteran’s self-reported gross household income information that potentially impacts eligibility for VA health care benefits, HEC must independently verify the IRS and SSA income data. If the Veteran’s eligibility for VA health care benefits is changed as a result of the income verification process, HEC will transmit the updated eligibility information to those facilities that provided health services to the Veteran during the applicable income-reporting period. HEC’s Income Verification Division (IVD) sends Veterans and spouses, individual letters to confirm income information reported by IRS and SSA. HEC does not change the Veteran’s copay status until information supplied by IRS and SSA has been independently verified, either by the Veteran or through appropriate due process procedures.

202203-2060-012 NSPS for the Phosphate Fertilizer Industry (40 CFR Part 60, Subparts T, U, V, W, and X) (Renewal) EPA/OAR Active
Extension without change of a currently approved collection
NSPS for the Phosphate Fertilizer Industry (40 CFR Part 60, Subparts T, U, V, W, and X) (Renewal)

Key Information

Received 2022-03-31
Concluded 2022-06-03
Expires 2025-06-30
Action Approved without change
OMB Control # 2060-0037
Previous ICR 201904-2060-004

Federal Register Notices

60-Day FRN View Notice
30-Day FRN View Notice

Authorizing Statutes

42 USC 7401 et.seq. (View Law)

Abstract

The New Source Performance Standards (NSPS), for Phosphate Fertilizer Industry (40 CFR Part 60, Subparts T, U, V, W, and X) were proposed on October 22, 1974, promulgated on August 6, 1975, and amended on August 19, 2015 . These regulations apply to both existing facilities and new facilities that engage in the manufacture of phosphate fertilizers (wet-process phosphoric acid plants, super-phosphoric acid plants, diammonium phosphate plants, and triple superphosphate plants), and have a design capacity of more than 15 tons of equivalent phosphorous pentoxide (P2O5) feed per calendar day. These standards also apply to new and existing facilities that store granular triple superphosphate. These same standards establish fluoride emission limitations as a measure of phosphorus-bearing feed material at affected facilities. The affected facilities may include a combination of reactors, filters, evaporators, hot wells, acid sumps, cooling tanks, granulators, dryers, coolers, screens, mills, mixers, curing belts (dens), coolers, and facilities which store run-of-pile triple superphosphate, depending on the type of plant. New facilities include those that commenced construction, modification or reconstruction after the date of proposal. This information is being collected to assure compliance with 40 CFR Part 60, Subpart T, U, V, W, and X. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NSPS.

202201-2060-018 NESHAP for Gasoline Distribution Bulk Terminals, Bulk Plants, Pipeline Facilities and Gasoline Dispensing Facilities (40 CFR part 63, subparts BBBBBB and CCCCCC) (Renewal) EPA/OAR Active
Revision of a currently approved collection
NESHAP for Gasoline Distribution Bulk Terminals, Bulk Plants, Pipeline Facilities and Gasoline Dispensing Facilities (40 CFR part 63, subparts BBBBBB and CCCCCC) (Renewal)

Key Information

Received 2022-01-28
Concluded 2022-06-02
Expires 2025-06-30
Action Approved without change
OMB Control # 2060-0620
Previous ICR 201812-2060-003

Federal Register Notices

60-Day FRN View Notice
30-Day FRN View Notice

Authorizing Statutes

42 USC 7401 et seq (View Law)

Abstract

The NESHAP for Source Categories: Gasoline Distribution Bulk Terminals, Bulk Plants, Pipeline Facilities, and Gasoline Dispensing Facilities applies to owners or operators of any existing or new gasoline distribution facilities that are an area source of hazardous air pollutants (HAP) emissions. In addition to the initial notification and notification of compliance status required by the General Provisions (40 CFR Part 63, Subpart A), respondents are required to submit one-time reports of start of construction, anticipated and actual startup dates, and physical or operational changes to existing facilities. Reports of initial performance tests on control devices at gasoline distribution storage tanks, loading racks, and vapor balance systems are also required and are necessary to show that the installed control devices are meeting the emission limitations required by the NESHAP. Annual reports of storage tank inspections at all affected facilities are required. In addition, respondents must submit semiannual compliance and continuous monitoring system performance reports, and semiannual reports of equipment leaks not repaired within 15 days or loadings of cargo tanks for which vapor tightness documentation is not available.

202111-0648-001 Scientific Research, Exempted Fishing, and Exempted Educational Activity Submissions DOC/NOAA Active
Extension without change of a currently approved collection
Scientific Research, Exempted Fishing, and Exempted Educational Activity Submissions

Key Information

Received 2021-11-09
Concluded 2022-06-02
Expires 2025-06-30
Action Approved without change
OMB Control # 0648-0309
Previous ICR 201807-0648-005

Federal Register Notices

60-Day FRN View Notice
30-Day FRN View Notice

Authorizing Statutes

Pub.L. 94 - 265 3 (View Law)

Abstract

This request is for extension of a current information collection. Information collections that are already covered under other OMB Control Nos. have been removed. The Magnuson-Stevens Fishery Conservation and Management Act (MSA) and its regulations do not generally affect scientific research activities conducted by a scientific research vessel. Persons planning to conduct such research are encouraged to submit a scientific research plan to ensure that the activities are considered research and not fishing. The researchers are requested to submit reports of their scientific research activity after its completion. The National Marine Fisheries Service (NMFS) may also grant exemptions from fishery regulations for educational or other activities (e.g., using non-regulation gear). The applications for these exemptions must be submitted, as well as reports on activities. Eligible researchers on board federally permitted fishing vessels that plan to temporarily possess fish in a manner not compliant with applicable fishing regulations for the purpose of collecting scientific data on catch may submit a request for a temporary possession letter of authorization. The researchers are requested to submit reports of their scientific research activity after its completion. .

202110-0570-003 Rural Innovation Stronger Economy (RISE) grant program USDA/RBS Active
Revision of a currently approved collection
Rural Innovation Stronger Economy (RISE) grant program

Key Information

Received 2021-12-13
Concluded 2022-06-01
Expires 2025-06-30
Action Approved with change
OMB Control # 0570-0075
Previous ICR 202105-0570-002

Federal Register Notices

60-Day FRN View Notice
30-Day FRN View Notice

Authorizing Statutes

Pub.L. 115 - 334 6424 (View Law)

Abstract

The purpose of the RISE program (7 CFR 4284 subpart L) is to create and enhance jobs and support industry clusters in low-income rural areas. This is achieved through grants awarded to a rural jobs accelerator partnerships consisting of non-profit entities, Tribal entities, institutions of higher education and public bodies with expertise in delivering economic and job training programs. The information provided through the application process will be used to determine applicant and project eligibility and to ensure that projects meet program goals and that funds will be used for authorized purposes. Additionally, Partnerships that receive RISE grant funding are required to provide financial and program reports to ensure that the project is progressing, and that funds continue to be used for authorized purposes.

202204-0910-005 Compounding Animal Drugs from Bulk Drug Substances HHS/FDA Active
New collection (Request for a new OMB Control Number)
Compounding Animal Drugs from Bulk Drug Substances

Key Information

Received 2022-04-14
Concluded 2022-06-01
Expires 2025-06-30
Action Approved without change
OMB Control # 0910-0904

Federal Register Notices

60-Day FRN View Notice
30-Day FRN View Notice

Abstract

This information collection accounts for burden that may be attendant to recommendations discussed in FDA guidance applicable to pharmacists and veterinarians who compound animal drugs from bulk drug substances.

202204-0910-002 Foreign Supplier Verification Programs for Importers of Food for Humans and Animals HHS/FDA Active
Extension without change of a currently approved collection
Foreign Supplier Verification Programs for Importers of Food for Humans and Animals

Key Information

Received 2022-04-28
Concluded 2022-06-01
Expires 2025-06-30
Action Approved without change
OMB Control # 0910-0752
Previous ICR 201902-0910-005

Federal Register Notices

60-Day FRN View Notice
30-Day FRN View Notice

Authorizing Statutes

Pub.L. 111 - 353 301 (View Law)

Abstract

The FSVP regulations require importers of most imported foods to take steps to verify that the foods they import into the United States are produced so they are safe and properly labeled with respect to allergens. These regulations are intended to work in tandem with other provisions of FSMA and the FD&C Act to create a more seamless system of food safety to protect U.S. consumers. Respondents to the collection are persons who import food into the United States subject to agency regulations.

202104-1018-001 Online Eastern Population Sandhill Crane Survey Data Entry Portal DOI/FWS Active
New collection (Request for a new OMB Control Number)
Online Eastern Population Sandhill Crane Survey Data Entry Portal

Key Information

Received 2021-06-11
Concluded 2022-06-01
Expires 2025-06-30
Action Approved without change
OMB Control # 1018-0185

Federal Register Notices

60-Day FRN View Notice
30-Day FRN View Notice

Authorizing Statutes

16 USC 703-712 (View Law)

Abstract

The Migratory Bird Treaty Act (16 U.S.C. 703–712) designates the Department of the Interior as the primary agency responsible for managing migratory bird populations frequenting the United States and setting hunting regulations that allow for the well-being of migratory bird populations. These responsibilities dictate that we gather accurate data on various characteristics of migratory bird populations. The Service’s fall survey for eastern population sandhill crane was established in 1979. It is implemented by state and Federal agencies and public volunteers from eight states in the Atlantic and Mississippi Flyways, as well as Ontario, Canada. Sandhill cranes are widely dispersed during the breeding and wintering seasons and are difficult to count. The optimal time to survey cranes is during the last week of October when the majority of eastern population cranes breeding in Canada migrate to traditional staging grounds in the Great Lake States (e.g. Jasper-Pulaski Fish and Wildlife Area, Medaryville, Indiana). Since the initial survey in 1979, crane numbers have increased to over 90,000 birds.

202201-0917-003 Indian Health Service Purchased/Referred Care Proof of Residency HHS/IHS Historical Active
Reinstatement without change of a previously approved collection
Indian Health Service Purchased/Referred Care Proof of Residency

Key Information

Received 2022-04-25
Concluded 2022-06-01
Expires 2025-06-30
Action Approved without change
OMB Control # 0917-0040
Previous ICR 201811-0917-001

Federal Register Notices

60-Day FRN View Notice
30-Day FRN View Notice

Authorizing Statutes

Pub.L. 83 - 568 Part 1 (View Law)

42 USC 136 (View Law)

25 USC 13 (View Law)

Abstract

The IHS Purchased/Referred Care Program needs this information to certify that the health care services requested and authorized by the IHS have been provided to individuals who documented to meet the eligibility requirements to receive medical services for Purchased/Referred Care provider(s). It is also to serve as a legal document for health and medical care authorized by IHS and rendered by health care providers under contract with the IHS.

202201-2060-007 NSPS for Beverage Can Surface Coating (40 CFR part 60, subpart WW) (Renewal) EPA/OAR Active
Extension without change of a currently approved collection
NSPS for Beverage Can Surface Coating (40 CFR part 60, subpart WW) (Renewal)

Key Information

Received 2022-01-27
Concluded 2022-06-01
Expires 2025-06-30
Action Approved without change
OMB Control # 2060-0001
Previous ICR 201902-2060-003

Federal Register Notices

60-Day FRN View Notice
30-Day FRN View Notice

Authorizing Statutes

42 USC 7401 et.seq (View Law)

Abstract

The New Source Performance Standards (NSPS) for Beverage Can Surface Coating (40 CFR Part 60, Subpart WW) apply to each operation of the following surface coating lines in the Beverage Can Surface Coating industry: 1) exterior base; 2) over-varnished; and 3) inside spray. New facilities include those that commenced construction, modification, or reconstruction after the date of proposal. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance with 40 CFR Part 60, Subpart WW.

202201-2060-017 NESHAP for Ferroalloys Production: Ferromanganese and Silicomanganese (40 CFR Part 63, Subpart XXX) (Renewal) EPA/OAR Active
Extension without change of a currently approved collection
NESHAP for Ferroalloys Production: Ferromanganese and Silicomanganese (40 CFR Part 63, Subpart XXX) (Renewal)

Key Information

Received 2022-01-28
Concluded 2022-06-01
Expires 2025-06-30
Action Approved with change
OMB Control # 2060-0391
Previous ICR 201811-2060-017

Federal Register Notices

60-Day FRN View Notice
30-Day FRN View Notice

Authorizing Statutes

42 USC 7401 (View Law)

Abstract

The NESHAP for Ferroalloys Production: Ferromanganese and Silicomanganese applies to new and existing ferroalloy production facilities that manufacture ferromanganese and silicomanganese, and that are either major sources of hazardous air pollutant (HAP) emissions or are co-located at major sources of HAPs. The following affected facilities at ferroalloy production plants are subject to this NESHAP rule: submerged arc furnaces; metal oxygen refining processes; crushing and screening operations; and fugitive dust sources. New facilities include those that commenced construction or reconstruction after the date of proposal. In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance with 40 CFR Part 63, Subpart XXX.

202201-2060-019 Emission Guidelines for Commercial and Industrial Solid Waste Incineration (CISWI) Units (40 CFR part 60, subpart DDDD) (Renewal) EPA/OAR Active
Extension without change of a currently approved collection
Emission Guidelines for Commercial and Industrial Solid Waste Incineration (CISWI) Units (40 CFR part 60, subpart DDDD) (Renewal)

Key Information

Received 2022-01-28
Concluded 2022-06-01
Expires 2025-06-30
Action Approved without change
OMB Control # 2060-0664
Previous ICR 201812-2060-007

Federal Register Notices

60-Day FRN View Notice
30-Day FRN View Notice

Authorizing Statutes

42 USC 7401 (View Law)

Abstract

The Emission Guidelines for Commercial and Industrial Solid Waste Incineration (CISWI) Units apply to any air quality program in either a state or a United States protectorate with one or more existing CISWI units. The guidelines can be thought of as model regulations that States use in developing State plans to implement the emission guidelines. If a state does not develop, adopt, and submit an approvable state plan, the Environmental Protection Agency (EPA) must develop a Federal plan to implement the emission guidelines. These regulations apply to existing CISWI units (units that commenced construction on or before the date of proposal). In general, all Emissions Guidelines standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance with 40 CFR part 60, subpart DDDD.

Why They Are Important

ICRs play a vital role in ensuring transparency and accountability in federal data collection. When federal agencies collect information from 10 or more "persons" (which includes individuals, businesses, and state, local, and tribal governments), they must submit an ICR to ensure that it fulfills their statutory missions, avoids unnecessary or duplicative requests, and minimizes burden on the American public. Additionally, Federal Register Notices (FRNs) and the opportunity for public comments provide a formal way for the public to be informed of proposed ICRs and participate in the process.

ICRs also serve as a key resource for tracking changes to federal data collections. The availability of detailed documentation, such as data collection instruments and methodologies, allows the general public to identify revisions in a timely manner. These may include revisions prompted by Executive Orders or statistical policies like OMB's Statistical Policy Directive No. 15 (SPD 15), which are often submitted as "nonsubstantive" or "nonmaterial" changes to a currently approved collection.[1] Furthermore, ICRs can help determine if a data collection has expired without renewal or has been intentionally discontinued. By reviewing ICRs, the public can better understand what data is being collected, how it evolves over time, and whether data collections have become inactive–often in response to shifting priorities and updated standards.

How To Use The Tool

The ICR tracking tool offers a user-friendly view of ICRs that have been recently submitted, reviewed, or are nearing expiration. By aggregating key data from individual ICRs, the tool allows users to view the current status of each request, including submission, conclusion, and expiration dates, details on whether any changes were made, authorizing statutes, and more. Users can search for specific information and filter results based on various criteria. If seeking additional information, various text fields are hyperlinked to the full ICR on RegInfo.gov and associated resources. The tool is updated on a daily basis to reflect the most current information available. Column descriptions are available below the table.

Column Name

Definition

Categories Include

ICRReferenceNumber

The ICR Reference Number uniquely identifies each ICR review. This number is assigned by the OIRA system when the ICR is created.

ICR Reference Numbers are formatted YYYYMM-NNNN-XXX where YYYYMM is the month of origin, NNNN is the agency/subagency code, and XXX is a 3 digit sequential number assigned per creation per month.

N/A

ICRTitle

The title of the information collection. If the submission is a revision to a currently approved collection, the title is the name of the overall collection rather than the name of the change taking place.

N/A

DateReceived

The date OIRA received the ICR submission from the agency.

N/A

OMBControl

OIRA assigns an OMB Control Number to an Information Collection Request (ICR) upon its first arrival. The same OMB Control Number is used for each review of the ICR.

OMB Control Numbers are formatted NNNN-XXXX, where the NNNN is the agency/subagency code, and the XXXX is a sequential number uniquely identifying the Collection within the agency/subagency’s ICRs.

N/A

DateReceived

The date OIRA received the ICR submission from the agency.

N/A

PreviousICRReferenceNumber

The reference number of the ICR that immediately preceded the current one.

N/A

AgencySubagency

The federal agency and specific subagency, if applicable, that submitted the ICR.

N/A

Abstract

A brief statement describing the need for the collection of information and how it will be used.

N/A

RequestType

Describes the purpose of the agency's submission.

  • "Extension without change of a currently approved collection"
  • "Existing collection in use without an OMB Control Number"
  • "Reinstatement with change of a previously approved collection"
  • "New collection (Request for a new OMB Control Number)"
  • "No material or nonsubstantive change to a currently approved collection"
  • "Revision of a currently approved collection"
  • "Reinstatement without change of a previously approved collection"
  • "RCF Recertification"
  • "RCF No Material or nonsubstantive change to a currently approved collection"
  • "RCF New"

TypeOfReviewRequest

Indicates the specific type of action being requested for review.

  • "Regular"
  • "Emergency"
  • "Delegated"

Status

Indicates the current stage of the ICR in OIRA's review process.

  • "Received in OIRA" for ICRs currently under review by OIRA
  • "Active" for ICRs that are currently approved for use by agencies
  • "Historical Active" for previous reviews of ICRs that are currently in the active inventory
  • "Historical Inactive" for previous reviews of ICRs that are not currently in the active inventory
  • "PreApproved" for ICRs that will become active once the Final Rule of their associated rulemaking has been published

ConcludedDate

The date OIRA completed its review of the ICR.

N/A

ConclusionAction

OIRA's final decision about the ICR.

  • “Comment filed on Interim Final Rule”
  • “Comment filed on Interim Final Rule and continue”
  • “Disapproved”
  • “Approved without change”
  • “Approved with change”
  • “Comment filed on proposed rule”
  • “Preapproved”
  • “Withdrawn”
  • “Withdrawn and continue”
  • “Not subject to PRA”
  • “Not subject to PRA and continue”
  • “Improperly submitted”
  • “Improperly submitted and continue”
  • “Delegated”
  • “Comment filed on proposed rule and continue”
  • “Disapproved and continue”
  • “Returned - Improperly Submitted”
  • “Returned to Agency for Reconsideration”
  • “Returned - Outside Generic Clearance”
  • “Approved”

CurrentExpirationDate

The date the ICR is set to expire unless it is renewed.

N/A

AuthorizingStatues

Names of federal laws that authorize the agency to collect the information.

N/A

AuthorizingStatuesDetails

Additional details about the legal authority for the information collection, including a URL linking to the full text.

N/A

CitationsForNewStatutoryRequirements

Legal citations that have introduced new or modified statutory requirements since the last ICR submission.

N/A

FederalRegisterNotices

Lists citations of 60-day and 30-day notices published in the Federal Register.

N/A

PublicCommentsReceived

Indicates whether any public comments were received during the Federal Register notice period.

N/A

InformationCollections

Lists the individual information collections associated with the ICR. Each collection includes metadata such as the title, a URL to the collection, the form number (if applicable), and a URL to the form.

N/A

RequestType Filters

1. Select "New collection (Request for an OMB Control Number)" for collections that had not previously been used or sponsored by the agency.

2. Select "Extension without change or a currently approved collection" for collections where the agency wished only to extend the approval of an active collection past its current expiration date without making any material change in the collection instrument, instructions, frequency of collection, or the use to which the information is to be put.

3. Select "Revision of a currently approved collection" for collections where the agency request included a material change to the collection instrument, instructions, its frequency of collection, or the use to which the information is to be put.

4. Select "Reinstatement without change of a previously approved collection" for collections which previously had OMB approval, but the approval had expired or was discontinued before this submission was made, and there is no change to the collection.

5. Select "Reinstatement with change of a previously approved collection" for collections which previously had OMB approval, but the approval has expired or was discontinued before this submission was made, and there is some change to the collection.

6. Select "Existing collection in use without OMB control number" when the collection is currently in use but does not have an OMB control number.

7. Select "No material or nonsubstantive change to a currently approved collection" for collections which introduce minor changes to the ICR, but do not extend the expiration date of the collection.

8. Select "RCF No material or nonsubstantive change to a currently approved collection" for RCF collections that introduce changes to the usage of an active RCF.

9. Select "RCF New" for RCF collections that are the initial usage of the Common Form Host ICR by the using agency.

10. Select "RCF Recertification" for RCF collections that had been recertified due to changes in its related Common Form Host ICR.

[1] "Nonsubstantive" and "nonmaterial" changes introduce minor modifications to the ICR but do not extend the collection's expiration date or require a public comment period.

Subscribe